To calculate the Cost of Goods Manufactured (COGM), sum up the manufacturing costs, direct labor, and manufacturing overhead, then adjust for the beginning and ending work-in-progress inventory.
The Cost of Goods Manufactured (COGM) Calculator determines the total production cost of goods completed during a specific period. It includes direct materials, direct labor, and manufacturing overhead while accounting for changes in work-in-progress inventory. This metric is critical for manufacturers to track production costs, set pricing strategies, and evaluate operational efficiency.
Formula:
Contents
Variables:
Variable | Description | Unit |
---|---|---|
Cost of Goods Manufactured | Currency ($) | |
Material Costs | Currency ($) | |
Labor Costs | Currency ($) | |
Manufacturing Overhead | Currency ($) | |
Beginning Work-in-Progress Inventory | Currency ($) | |
Ending Work-in-Progress Inventory | Currency ($) |
Solved Calculations:
Example 1: Calculate COGM (
Step | Value | Explanation |
---|---|---|
Material Costs () | Given | |
Labor Costs () | Given | |
Overhead () | Given | |
Beginning WIP () | Given | |
Ending WIP () | Given | |
Calculation | Plug into formula | |
Simplification | Simplify terms | |
Result | Total cost of goods manufactured |
Example 2: Calculate COGM (
Step | Value | Explanation |
---|---|---|
Material Costs () | Given | |
Labor Costs () | Given | |
Overhead () | Given | |
Beginning WIP () | Given | |
Ending WIP () | Given | |
Calculation | Plug into formula | |
Simplification | Simplify terms | |
Result | Total cost of goods manufactured |